Council & Government landscape Construction

A reliable landscape construction partner for public land

Why procurement teams choose us

Built to the specification, documented to the standard

This page answers the questions procurement teams ask most, so your evaluation panel can see how we work before the first conversation.

  • Registered through Central Coast Council’s VendorPanel and Tenderlink, and on buy.nsw
  • Work to your specification, with records kept as the work progresses
  • Safe work method statements for every site, and traffic management plans prepared by licensed contractors where required
  • Reporting and sign-off documentation throughout the job
  • Delivered work for Central Coast Council, including the Buttonderry Waste Facility at Jiliby, a contract of more than $400,000
  • A team led by 33 years of hands-on landscape construction experience

Delivery

How a council project runs with us

Pre-start

Site inspection, scope review and a project-specific plan covering safety, quality, traffic and environmental controls.

Mobilisation

Inductions, SWMS sign-off, insurances confirmed and subcontractors verified before anyone is on site.

Construction

Inspection and test plans with agreed hold points, erosion and sediment control maintained, and regular progress reporting.

Handover

Site reinstated, as-built information and records supplied, and a walk-through with your representative.

Defects liability

Completed work is covered by the statutory warranty periods in NSW (2 and 6 years), and we return promptly to rectify anything that falls within them.

Reporting

Incidents and near misses reported to your project manager immediately, with a written follow-up.

Credentials

The detail behind a tender response

Engineering consultancy. Placeholder image, replace with a project photo.

Accreditations, licences and insurance

Registrations, licences and cover, with certificates available on request.

Earthworks on site. Placeholder image, replace with a project photo.

Work health and safety

How we plan and run safe sites, from SWMS to site inductions.

Sustainability

Environmental management measures we build into every project.

Document library

Documents ready for your tender pack

  • Capability statement (PDF)
  • Work Health & Safety policy
  • Sample safe work method statement (SWMS)
  • Certificates of currency (public liability and workers compensation)
  • Sample environmental management plan

Procurement contact

Adam McCall (Founding Director) or Taylor Gunn (Managing Director)

0450 550 494 | info@adamsgarden.com.au

Tender and RFQ enquiries are usually answered within one business day.

Tender questions

The questions procurement teams ask

We are registered through Central Coast Council’s VendorPanel and Tenderlink, and on buy.nsw. You can also contact us directly about quotes and tenders.

We build to your specification and agree the key inspection points with your superintendent or project manager before work starts. Records are kept as the work progresses and handed over at completion.

Where traffic management is required, we engage licensed traffic control contractors who prepare and implement the plan, approved before works begin.

Yes. We plan works in stages with fencing, signage and public access management, and can discuss working outside standard hours where a project requires it.

Our work is delivered by our own in-house team and plant. Where a specialist is engaged, they carry their own insurance and are inducted and signed on to the project SWMS, and we stay responsible for their work and safety performance on site.

Completed work is covered by the statutory warranty periods in NSW (2 and 6 years). If something within the period needs attention, we attend promptly and rectify it.

Yes. Trading history and referee details are available on request, in confidence, as part of a tender response.

We are based on the Central Coast and source materials from Central Coast quarries and suppliers wherever practical.

Aboriginal site monitors visit regularly on all of our National Parks works, and our team has completed cultural awareness training. We have worked with Worimi and Darkinjung Local Aboriginal Land Councils on past projects. See our Aboriginal Cultural Heritage page for more.

We work to the environmental conditions in your REF or equivalent assessment. An erosion and sediment control plan is prepared before ground disturbance and maintained throughout the works.

Yes. We have built DDA-compliant tracks, including at the Bouddi Coastal Walk and Crackneck Walking Track, to the gradients, widths and surfaces in the design.

Incidents and near misses are reported to your project manager immediately, and notifiable incidents are reported to SafeWork NSW as required under the WHS Act. A written report follows.

Working on a tender or RFQ?

Send us the scope and closing date. We will confirm capacity and respond with the documents you need.

Before we turn the soil or lay a single stone, we acknowledge those who have nurtured it for generations. Adam's Garden acknowledges the Darkinjung people, the Traditional Custodians of the Central Coast, and recognises their sovereignty which was never ceded. Theirs is the original and enduring connection to this Country. We strive to walk gently and work with respect on the land they have cared for since time immemorial. We pay our respects to their Elders—past, present, and the young ones who are the new growth of their community.

© Copyright Adam's Garden, All Rights Reserved

Made & Hosted by OBSERVED