
Why procurement teams choose us
This page answers the questions procurement teams ask most, so your evaluation panel can see how we work before the first conversation.
Delivery
Site inspection, scope review and a project-specific plan covering safety, quality, traffic and environmental controls.
Inductions, SWMS sign-off, insurances confirmed and subcontractors verified before anyone is on site.
Inspection and test plans with agreed hold points, erosion and sediment control maintained, and regular progress reporting.
Site reinstated, as-built information and records supplied, and a walk-through with your representative.
Completed work is covered by the statutory warranty periods in NSW (2 and 6 years), and we return promptly to rectify anything that falls within them.
Incidents and near misses reported to your project manager immediately, with a written follow-up.
Credentials

Registrations, licences and cover, with certificates available on request.

How we plan and run safe sites, from SWMS to site inductions.

Environmental management measures we build into every project.

Document library
Adam McCall (Founding Director) or Taylor Gunn (Managing Director)
0450 550 494 | info@adamsgarden.com.au
Tender and RFQ enquiries are usually answered within one business day.
Tender questions
We are registered through Central Coast Council’s VendorPanel and Tenderlink, and on buy.nsw. You can also contact us directly about quotes and tenders.
We build to your specification and agree the key inspection points with your superintendent or project manager before work starts. Records are kept as the work progresses and handed over at completion.
Where traffic management is required, we engage licensed traffic control contractors who prepare and implement the plan, approved before works begin.
Yes. We plan works in stages with fencing, signage and public access management, and can discuss working outside standard hours where a project requires it.
Our work is delivered by our own in-house team and plant. Where a specialist is engaged, they carry their own insurance and are inducted and signed on to the project SWMS, and we stay responsible for their work and safety performance on site.
Completed work is covered by the statutory warranty periods in NSW (2 and 6 years). If something within the period needs attention, we attend promptly and rectify it.
Yes. Trading history and referee details are available on request, in confidence, as part of a tender response.
We are based on the Central Coast and source materials from Central Coast quarries and suppliers wherever practical.
Aboriginal site monitors visit regularly on all of our National Parks works, and our team has completed cultural awareness training. We have worked with Worimi and Darkinjung Local Aboriginal Land Councils on past projects. See our Aboriginal Cultural Heritage page for more.
We work to the environmental conditions in your REF or equivalent assessment. An erosion and sediment control plan is prepared before ground disturbance and maintained throughout the works.
Yes. We have built DDA-compliant tracks, including at the Bouddi Coastal Walk and Crackneck Walking Track, to the gradients, widths and surfaces in the design.
Incidents and near misses are reported to your project manager immediately, and notifiable incidents are reported to SafeWork NSW as required under the WHS Act. A written report follows.
Send us the scope and closing date. We will confirm capacity and respond with the documents you need.
© Copyright Adam's Garden, All Rights Reserved
Made & Hosted by OBSERVED